Luther M (2006)
Publication Type: Journal article
Publication year: 2006
Publisher: PennWell Corp.
Pages Range: 59-60
Journal Issue: 10-11
URI: http://www.ees.eei.fau.de/down/pub/ml/20061000_ml_ConnectionEastAndWest.pdf
An on-going feasibility study launched by the Union for the Co-ordination of Transmision of Electricity (UCTE), the association of transmission system operators in continental Western Europe, will provide information regarding all technical, operational and legal feasibility aspects of a synchronous interconnection of IPS/UPS and UCTE. A precondition for an extension of the synchronous are beyond UCTE is to keep the reliability of the system at the high level and the necessary measures and rules must be defined within a binding contract. To pursue this feasibility study a number of bodies have been established such as Project Representative board (PRB), responsible for political communication and lobbying, and a PMB responsible for steering the project, deciding on further steps and approving workgroup progress and reports. On the basis the findings of these groups, the total cost and individual cost of the full synchronous interconnection and each necessary measure, will be evaluated.
APA:
Luther, M. (2006). Connecting East and West. PEI Power Engineering International, 10-11, 59-60.
MLA:
Luther, Matthias. "Connecting East and West." PEI Power Engineering International 10-11 (2006): 59-60.
BibTeX: Download